skip to main
|
skip to sidebar
Try This Boat Plans
Pages
Beranda
Sabtu, 17 Desember 2016
Almost
One more cycle of fill and sand, and the fairing should be done.
Related Posts by Categories
0 komentar:
Posting Komentar
Posting Lebih Baru
Posting Lama
Beranda
Postingan Populer
Iqyax Baidarka Flexibility Revisited
One more time now. Back to the topic of what makes baidarkas flexible and why one would make a baidarka flexible. This I hope to be a defini...
Whats Popular More Stats
In a previous post I was musing on what makes certain posts more popular than others. I looked at the stats that google provides to the blo...
Scarfing post mortem
Ok. I admit defeat on scarfing the panels. After fairing and filling the first two panels on for the bottom, I have decided to just do the...
centerboard shaping
The Centerboard has been roughed out to its approximate final shape and I have become a tad obsessive compulsive regarding the final shape. ...
Blocking
The keyword for the current phase of the build, I suppose, would be "blocking." "Blocking" is the term to describe the l...
Chagudax
It used to be that the only way to get your memoir published was to be a famous person or an interesting writer or to have such an interesti...
Escargot Canal Boat Plans
Phil thiel's escargot is a house/canal boat designed for slow, enjoyable journeys in protected...
Wooden Boat Plans Dinghy
Plans - boatbuilding. we are plans agents for quite a few designers, including john atkin, phil bo...
Boat Building Plans Steel
Steel shrink-wrap methods in progress the photos below show the sorenson steel boatbuilding method...
Sail Speed Records
New speed records for sail powered water craft are being set constantly. The latest by the Vestas sailrocket is 65.45 knots. Of course thes...
Blog Archive
►
2019
(101)
►
Januari
(101)
►
2018
(680)
►
Desember
(179)
►
November
(126)
►
September
(112)
►
Agustus
(97)
►
Juli
(103)
►
Juni
(63)
►
2017
(438)
►
Oktober
(7)
►
September
(58)
►
Agustus
(73)
►
Juli
(75)
►
Juni
(70)
►
Mei
(82)
►
April
(37)
►
Januari
(36)
▼
2016
(257)
▼
Desember
(25)
A little more painting
The Herons are Back
Paddle Design Stability
Swedish Americas Cup Boat
Seat blocking epoxys love affair with tape
slot gasket
Fiberglass and other crimes
Two Coats of Sea Foam Green
winter update
centerboard shaping
Planking progress stalled by need to encapsulate stem
Almost
The Camping Yurt
Next stop Transom
Sausalito Houseboats and Rowboats
Stegosaurus Boat Construction
Glass applied now to fill the weave
Iqyax Baidarka Flexibility Revisited
Fitting the Utility’s port side planking — and a l...
G9 minus nine
Epoxy work on seats sheer and Zip parts
How Many Kayaks Are There
Completion of starboard bottom
More fairing on the Utility This time the transom
Hot Springs Village Archaeological Site
►
November
(29)
►
Oktober
(28)
►
September
(33)
►
Agustus
(23)
►
Juli
(20)
►
Juni
(26)
►
Mei
(34)
►
April
(19)
►
Maret
(20)
►
2015
(500)
►
Juni
(82)
►
Mei
(225)
►
April
(191)
►
Maret
(2)
Diberdayakan oleh
Blogger
.
0 komentar:
Posting Komentar